Yesterday, November 11, 2023, the floor covering lamination line, i.e. the hot pressing line, entered the port of Batumi. This is the first stage of equipping our plant with production facilities. The device arrived on the territory of the plant.


Yesterday, November 11, 2023, the floor covering lamination line, i.e. the hot pressing line, entered the port of Batumi. This is the first stage of equipping our plant with production facilities. The device arrived on the territory of the plant.