Completion of the commissioning work

The Flooreo factory has completed the installation of the locking joint profiling line. All three stages of the line: cutting of locking joints, fascia painting, packaging of finished products are ready for full operation. The system has been successfully launched.

Independent Day!!!

The Flooreo factory congratulates you on this great holiday!!! A wonderful holiday of friendly, cheerful, beautiful people with delicious cuisine and hospitality. On this day, the Flooreo factory congratulates all its friends and partners. Let us all take care of our home, friends, our traditions, our country!!!

Commissioning works of the profiling line of locking connections

The commissioning works consist of three stages: installation, software installation, line commissioning. The locking joint profiling machine is an independent stage in the production of floor coverings, and everything changes at once if we integrate the fascia painting stages and product packaging. The integration of these three independent stages is realized in our factory. The …

The end of the first stage. Equipment of production capacities

It was a difficult and important job. It was difficult to meet the installation deadlines, our specialists enthusiastically coped with difficulties at all stages of the work. The launch took place according to schedule. The foundation has been laid, we will wait for the remaining lines.

Hot press line commissioning works

Factory Flooreo’s manufacturing capacity is a fundamental concept in the production of quality floor coverings. Engineer-technologists have completed commissioning of the hot press/lamination line.

Mother’s day!!!

Being a mother is the most important, sacred and supreme purpose that a person can have in life. With all my heart and soul, I congratulate our mothers on their “professional” day. After all, motherhood is 24/7 work without weekends or holidays. Let their self-sacrificing work, full of passion and feelings, bring them colossal pleasure, …